World-class Infrastructure with expanded manufacturing facility : |
|
Continuous development and growth led Pelican towards
establishing a world-class infrastructure. Today with
total land area of 20,000 plus square meters, a
state-of-the-art design and manufacturing facilities are
located on the outskirts of Rajkot in Gujarat, one of
the most vibrant states of India.
World class integrated facilities comprise CAD design
department, electronic engineering division & control
panel manufacturing division, modern machinery equipped
workshop, assembly shop, fabrication shop, metal
treatment shop, Powder Coating Plant with paint shop,
and testing facility under one roof…and all the areas
are empowered with new and better facilities.
Assembly Shop
More than 2800 square meters with R.C.C
roofing provides ample space and conditioned environment
for machine assembly. |
| |
|
|
|
 |
|
CAD Design Department :
A team of highly qualified and
experienced Engineers from various disciples is the core
of the department. Autodesk Inventor Professional-2008,
Autocad 2007, Ideas & Delcam are among the major
software tools used for designing, simulation and
machining programs. |
| |
|
|
|
 |
|
Electronic
Engineering Division & Control Panel manufacturing
division:
500 plus
square meters building for control panel division with
all the required infrastructural facility like testing
table and other instruments & software to fulfill
current and future panel requirements in-house.
Highly experienced and talented Engineers in these
departments are able to handle total projects
independently. The major software tools used are E-plan
& Mathcad etc. programs. |
| |
|
|
|
 |
|
Assembly Shop:
3000 plus square meters provides ample space and conditioned environment for machine
assembly.
Electronic Engineering Division:
600 plus square meters to build control panel and software development in-house with highly
experienced and talented engineers. Major software tools used are
E-PLAN & MathCAD etc.
|
| |
|
|
|
 |
|
Workshop :
CNC-Shop :
1000 plus square meters of CNC work-shop is equipped with many CNC machines like Vertical
Machining Centers, Turning Centers and Turn-Mill Centers backed by
primary machining shop. Almost every components
Primary
Machining Shop :
2500 plus square meters of
rough and primary machining shop is equipped with numbers of Lathes,
Grinding Machines, Welding etc.
|
| |
|
|
|
 |
|
Fabrication shop :
700 plus square meters of fabrication shop has facility with CNC shearing and bending
machines, profile cutting machines and various welding equipments.
Store :
Almost 600 plus square meters of total store area with modern storage and lifting equipments make
the stores management much easier.
|
| |
|
|
|
 |
|
Administration
Building
:
2,000 plus
square meters buildup area of well
equipped admin building with other facilities like guest
accommodation, canteen, gym and indoor sports etc. to provide
professional working environment.
|